# Building documentation The order on which the building of construction sites is limited. As there are multiple classes possible for building. First attempt is to pass the wanted sites to the comms and let the builders request sites if they cant find or work on one. ## Construction Manager Responsible for structures ## Infrastructure Manager Responsible for roads Builder wants to work but cant find a construction site within its room. Ask through the comms for a construction site. Who should be responsible for creating the structure as it could be the construction manager or infra structure manager. As we have no way what a good outcome is, we just build one whichever manager runs first ### Building Layout Construction Manager As I understood correctly there are [three types](https://youtu.be/YcruUDbqa7E) of ways to do base planning. - Bunker - Stamp - Dynamic ### Design philiophy Roads first, create or reserve at least space for the main roads. After that fill in the structures dynamically. ### RCL 3 **Extension** Build the extensions dynamically. #### Main Roads Main roads are - From sources to controller - From sources to spawn